OAU 0.00% 0.6¢ ora gold limited

Diamond drilling, page-5

  1. 913 Posts.
    lightbulb Created with Sketch. 55
    I'll take a stab at the likely cash left.
    I would think the latest drilling costs may be $1.2M plus your Q estimate of $400K
    So that leaves $4M to do downhole geo surveys (likely 10 at least) and diamond drilling.
    Hopefully we will get at least eight 500+metre holes with that.
    What i would like to know what is the likely cost of diamond drilling geo surveys per hole.
    We can then do a CR on some magnificent results.
 
watchlist Created with Sketch. Add OAU (ASX) to my watchlist
(20min delay)
Last
0.6¢
Change
0.000(0.00%)
Mkt cap ! $39.27M
Open High Low Value Volume
0.6¢ 0.6¢ 0.6¢ $5.5K 1M

Buyers (Bids)

No. Vol. Price($)
22 27546006 0.5¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 28838669 26
View Market Depth
Last trade - 13.57pm 19/07/2024 (20 minute delay) ?
OAU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.