PCP paramount mining corporation ltd

1Paramount Mining Corporation LtdABN 73 102 426 175170 Railway...

  1. 20,457 Posts.
    lightbulb Created with Sketch. 269
    1
    Paramount Mining Corporation Ltd
    ABN 73 102 426 175
    170 Railway Parade, West Leederville, Perth, Western Australia 6007
    Business: TEL (618) 93824822 FAX (618) 93824899
    Email: [email protected]
    24th October 2006 Report to the Australian Stock Exchange
    ___________________________________________________________________________
    DIAMOND PROGRAMME CONFIRMS LARGE LAMPROITE BODY
    ________________________________________________________________
    A major drilling programme at Paramount Mining Corporation Limited’s Ellendale
    Project in the north of Western Australia has confirmed the presence of lamproite, a
    rock type which can host diamonds, over a large surface area.
    The ASX listed diamond explorer (“PCP”) said today that, according to field
    interpretation, lamproite has been intersected in at least 25 holes of the 44-hole drilling
    programme completed this month. The body is estimated to be at least 15 hectares in
    surface area and, in two directions, is not closed off by the drilling.
    The target area lies within Prospecting Licence P 04/ 198 (being converted to P 04/ 219),
    located on the southern margin of the Napier Range, near Carpenter Gap. The tenement is
    around 19 kilometres northeast of Kimberley Diamond Corporation’s Ellendale Diamond Mine
    in the west Kimberley Province.
    “The field results suggest one large body is present, as opposed to several smaller ones,”
    Ms Maureen Muggeridge, Paramount’s Chief Executive Officer said today. “This
    supports data from our 2005 high-resolution aerial magnetometry survey, which
    indicated the lamproite target may be larger than was interpreted from earlier work”.
    A number of drill samples were collected for analysis. Tests will include microscopic
    examination of drill chips, geochemical assaying and mineralogical analysis in order to
    determine the various lamproite phases present. Microdiamond analysis will be carried out on
    selected samples from the more diamond prospective phases such as tuffaceous (“fragmental”)
    lamproite and material from certain marginal zones.
    “Tuffaceous lamproite has already been identified in four holes from field observations,”
    Ms Muggeridge said. “In each case several tens of metres of this material were
    intersected in the drill holes. In three cases the bottom of the hole was still in tuffaceous
    lamproite.”
    2
    Prepared by:
    Maureen Muggeridge
    Chairman / Chief Executive Officer
    The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is
    based on information compiled by Maureen Muggeridge, BSc, FAIG, Chairman and Chief Executive Officer
    of Paramount Mining Corporation Ltd. Ms Muggeridge is a full-time employee of the company. She has
    sufficient experience relevant to the style of mineralisation and type of deposits under consideration, and to
    the activity undertaken, to qualify as a competent person as defined in the 2004 Edition of the “Australasian
    Code for Reporting of Mineral Resources and Ore Reserves”. Maureen Muggeridge consents to the
    inclusion in the report of the matters based on her information in the form and context in which it appears.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.