A discovery assessment report must contain, at a minimum, the following information:
title details
preliminary estimate of location and areal extent of petroleum pool (such as structural maps and interpretative seismic sections)
details of geological structure where the petroleum pool is located
results of all assessments of the discovery (such as petrophysical interpretation logs, test results and pressure data)
preliminary estimate of quantity of petroleum in the pool (P10, P50 and P90)
data used to estimate the quantity of petroleum
preliminary estimate of recoverable petroleum
details of plans for further evaluation details of planned work for the next 12 months in the title area.
With about three employees, and it being the holiday season, will NWE be able to adhere to the requirements?
Add to My Watchlist
What is My Watchlist?