meeting was in Perth last night (Sunday) at 7pm. Nothing much new that wasn't covered in previous meetings. The plan for the PBR plant is to have both CO2 production for EOR combined with a small power plant to produce electricity. Aim for next years Perth meeting is to fly out using LINC aviation fuel.