I'm just listening to this now. The podcast which happened before the Avlon Airshow. I havn't got through all of your reading material @ozy944 yet, but I will read more closely this evening. My question is ozy what are terma constructing with regards to the F-35 project? Have they been given a workload, which is different to QHL or they are competing to create the same products, using the same materials and processes....?? If they are in competition for the same work which the company is doing right now that is concerning, but if it is different components of the plane than, great!!
What do you know about their production?
I'd be quietly confident if we are sole supplier for the parts which we are constructing at this point in time, that we are going to do the whole workload and that it will be a very profitable venture once it increases.
https://www.defenceconnect.com.au/s...y-director-of-aerospace-bae-systems-australia
PODCAST: Getting set for F-35 sustainment – Steven Drury, director of aerospace, BAE Systems Australia
https://www.defenceconnect.com.au/s...y-director-of-aerospace-bae-systems-australia
-----------------------------
I'm just listening to this now. The podcast which happened...
Add to My Watchlist
What is My Watchlist?