JKA 0.00% 0.3¢ jacka resources limited

director buys more, page-14

  1. 3,047 Posts.
    lightbulb Created with Sketch. 285
    "ASK" ENI Maamoura what they think 12 km away.

    Pie in the sky? No - perhaps up to 8000 barrels a day + gas.

    Maamoura and Baraka (25 km from Maamoura) Project

    The project consisted of Engineering, Procurement, Fabrication and Installation of 2 Platforms (2 Jackets: 1700 Tons; 2 Decks: 940 Tons; Piles: 1520 Tons) for an overall of 4.160 Tons. Procurement of 15 km coated Pipes 10”; Laying of 15 km Sealine 10”; Laying of 45 km Sealine 12”; Shore approach; Installation of 10” Subsea Valve, Post-trenching and Backfilling. Construction required utilisation of 4 offshore spreads (Crawler, Bar Protector, Angelo B, Ares), provided by 3 different main subcontractors. Team located in Tunis (Tunisia), Milan (Italy), Rijeka (Croatia), Aberdeen (UK).

    Contract Value $148 Million CDN
    Target Cost Contract
    Potential at least 15 years of production and potential to develop these known field some more.
 
watchlist Created with Sketch. Add JKA (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.