1.6ton per m2 of sand
large wheel loader 3m2 per bucket
12 hour shift 1/2 hour round trip ( most likely a lot less)
300 days a year
plant will be well feed for sand, the running cost for labor for the plant is going to very minimal, throw a solar plant on down the track cost of production should drop a lot.
even if you half blisters numbers from above that is huge money!! Another small thing from the quarterly was they named arrowsmith north then Muchea then central as the development
- Forums
- ASX - By Stock
- Directorships
1.6ton per m2 of sand large wheel loader 3m2 per bucket 12 hour...
Featured News
Add VRX (ASX) to my watchlist
|
|||||
Last
3.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $23.24M |
Open | High | Low | Value | Volume |
3.6¢ | 3.7¢ | 3.6¢ | $4 | 111 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 277054 | 3.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.7¢ | 318486 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 277054 | 0.034 |
3 | 105000 | 0.033 |
1 | 200000 | 0.032 |
2 | 411425 | 0.031 |
4 | 363376 | 0.030 |
Price($) | Vol. | No. |
---|---|---|
0.037 | 318486 | 3 |
0.038 | 50000 | 1 |
0.039 | 39999 | 1 |
0.040 | 70000 | 2 |
0.042 | 171626 | 2 |
Last trade - 16.10pm 05/07/2024 (20 minute delay) ? |
Featured News
VRX (ASX) Chart |