grouped some solar panels and 4x komatsu 200amp hr lead...

  1. 299 Posts.
    grouped some solar panels and 4x komatsu 200amp hr lead batteries and a wind generator to a log regulator on the Western Australian coast, with east and south westerly. Solar was efficient daytime and when clear days 11 and 16 hrs...Wind generator produced 24/7 but 60% of time only produced 12V. 10% above 13V charge parameters. Banging heads with myself to gear drive the rotor...? Thanks for reading.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.