If a 3 week week delay was not bad enough. Processing of the 2 tonnes was done on Saturday. How long does it take to test 2 tonnes. Thats not very much. So by Monday morning the processing was finished. Why was there a TH on Monday morning if Lab tests were not going to be done in that time. No wonder this is being sold off.