From Wackets's post about Pilbara they drilled 66 holes for 8511m. Therefore assuming the the same depth per hole for DKO they will drill approx. 28 holes. Lets say 7 per week. I would assume that the first weeks drilled holes will be sent for assay results and say 4 weeks later they should have the results. DKO will now the first assay results around this time next month