LRL 0.00% 2.5¢ labyrinth resources limited

re: august production figures due On the MLI quarter report...

  1. 606 Posts.
    lightbulb Created with Sketch. 18
    re: august production figures due On the MLI quarter report 31/07 :

    "... The mining plan at CAMS provides for a lower than average head grade for the month of August and September due to environmental considerations with regards to the prevailing wind direction and airborne dust control. The head grade is expected to increase as from October onwards.

    For this reason gold production according to the mining plan for the next quarter is expected to be in the region of 8000 ounces..."
 
watchlist Created with Sketch. Add LRL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.