Gold production is expected to increase to 40,000-45,000 ounces during the second half of FY18 and beyond, due to high grade ore from the M4 and Galaxy open pits being available to feed the process plant on a continuous basis, followed by the M1 and M2 open pits coming into production.
from the presentation
Four large scale gold systems capable of sustaining a sizeable long life operation
• Large resource of 61Mt @ 3.1 g/t for 6.2Moz Au(1)
• 51% Indicated Resource level • All deposits < 20km from plant
• Solid reserve base of 15.2Mt @ 2.5g/t for 1.2Moz Au(2)
• Operation has never had more than 0.4Moz reserves but has produced 4.4Moz
• Good mix of open pit & high grade UG ore
• Free milling resources 22.8Mt @ 1.76 g/t for 1.3Moz
• +1,100km2 of tenure & 55km of strike
• Multiple drill ready targets
• Exploration and reserve drilling to recommence in early march