Capacity is irrelevant here, as you’re no longer comparing apples to apples.
ASN planned capacity 13,000tpa in 1 stage.
LKE planned capacity 25,000tpa in 2 stages of 12,500tpa each.
What’s important is cycles per bead, Lilacs improved bead if cycled every 3 hours will last 1.3 years before replacement.
So 1.3 years at 25ktpa equals 32,500 tonnes per bead.
ASN in comparison 10 years at 13ktpa equals 130,000 tonnes per bead (technically resin).
- Forums
- ASX - By Stock
- Don't listen to downrampers
Capacity is irrelevant here, as you’re no longer comparing...
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LKE (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.2¢ |
Change
0.001(2.44%) |
Mkt cap ! $70.07M |
Open | High | Low | Value | Volume |
4.1¢ | 4.3¢ | 4.0¢ | $137.3K | 3.272M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 130536 | 4.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.2¢ | 251051 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 122000 | 0.041 |
7 | 466000 | 0.040 |
5 | 263775 | 0.039 |
8 | 522366 | 0.038 |
6 | 553081 | 0.037 |
Price($) | Vol. | No. |
---|---|---|
0.042 | 159000 | 2 |
0.043 | 703408 | 7 |
0.044 | 568749 | 5 |
0.045 | 838013 | 11 |
0.046 | 417572 | 5 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
LKE (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online