TDO 1.39% 7.1¢ 3d energi limited

Dorado 1 benefits, page-19

  1. 3,299 Posts.
    lightbulb Created with Sketch. 39
    http://www.3doil.com.au/projects/wa-527-p

    TDO anticipates that results of the upcoming drilling program scheduled for the Roebuck Basin in 2017 will enhance the prospectivity of WA-527-P. The Quadrant led Joint Venture is preparing to drill the Dorado-1 well on the Dorado Prospect, located to the south of the Roc structure. The results of this well could have implications for the prospectivity of WA-527-P, as TDO’s view is that the Dorado target could be within a similar geological setting as the leads that TDO’s technical evaluation has revealed.
 
watchlist Created with Sketch. Add TDO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.