http://www.3doil.com.au/projects/wa-527-p
TDO anticipates that results of the upcoming drilling program scheduled for the Roebuck Basin in 2017 will enhance the prospectivity of WA-527-P. The Quadrant led Joint Venture is preparing to drill the Dorado-1 well on the Dorado Prospect, located to the south of the Roc structure. The results of this well could have implications for the prospectivity of WA-527-P, as TDO’s view is that the Dorado target could be within a similar geological setting as the leads that TDO’s technical evaluation has revealed.
- Forums
- ASX - By Stock
- Dorado 1 benefits
http://www.3doil.com.au/projects/wa-527-p TDO anticipates that...
-
- There are more pages in this discussion • 52 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TDO (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.1¢ |
Change
-0.001(1.39%) |
Mkt cap ! $23.53M |
Open | High | Low | Value | Volume |
7.2¢ | 7.2¢ | 7.1¢ | $13.26K | 185.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 7.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.2¢ | 50000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 0.070 |
2 | 114500 | 0.069 |
1 | 100000 | 0.067 |
2 | 73001 | 0.066 |
1 | 76923 | 0.065 |
Price($) | Vol. | No. |
---|---|---|
0.072 | 50000 | 1 |
0.075 | 100000 | 1 |
0.080 | 13513 | 1 |
0.083 | 100000 | 1 |
0.085 | 6250 | 1 |
Last trade - 15.19pm 02/08/2024 (20 minute delay) ? |
Featured News
TDO (ASX) Chart |