stuff barrow island - where is the news flow re ps3 - the last update was two weeks ago....
At 31/5 they were at 4619m with the forward plan being:
"Run the 11-3/4” liner before drilling the 10-5/8” hole from 4,619 metres MD to approximately 5,160 metres MD. Following this, a 9-5/8” casing will be set before the 8-1/2” hole section is drilled to the top of the primary Caley Member section, which is expected to be intersected at a depth of approximately 5,360 metres MD"
I thought the comms plan was to report on milestones so either the drill bit is stuck or wtf??? No asx announcement re casing being set at 5360m after 2 weeks from a depth of 4619m is making me a little nervous - if all is going to plan why not report good news re 5630m casing.....
Adl
- Forums
- ASX - By Stock
- Dorado . Barrow Island
stuff barrow island - where is the news flow re ps3 - the last...
-
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
|
|||||
Last
20.0¢ |
Change
0.005(2.56%) |
Mkt cap ! $357.8M |
Open | High | Low | Value | Volume |
19.5¢ | 20.0¢ | 19.5¢ | $183.3K | 924.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 1015173 | 19.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.0¢ | 485462 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 992173 | 0.195 |
20 | 1305705 | 0.190 |
16 | 2255955 | 0.185 |
8 | 866116 | 0.180 |
7 | 382023 | 0.175 |
Price($) | Vol. | No. |
---|---|---|
0.200 | 475462 | 8 |
0.205 | 899125 | 13 |
0.210 | 705325 | 15 |
0.215 | 221747 | 5 |
0.220 | 843078 | 16 |
Last trade - 16.10pm 09/07/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |