BSX 6.25% 4.5¢ blackstone minerals limited

Downstream PFS along with a signed commitment from EcoPro (or...

  1. 602 Posts.
    lightbulb Created with Sketch. 132
    Downstream PFS along with a signed commitment from EcoPro (or any other majors in the EV space) puts a rocket under this SP in my opinion.

    Should be sitting at a minimum 400-450 million market cap post DBU PFS. There will be the Scoping Study on the Upstream and the PFS of the Downstream to crunch some real numbers (fundamentals) not to mention a much more robust Upstream Business Unit when that PFS is released to boost value even further.

    BTW when I say commitment I mean some initial funding for the pilot plant and the start up of the existing operations (450k throughput).

 
watchlist Created with Sketch. Add BSX (ASX) to my watchlist
(20min delay)
Last
4.5¢
Change
-0.003(6.25%)
Mkt cap ! $23.63M
Open High Low Value Volume
4.5¢ 4.5¢ 4.4¢ $3.14K 70.07K

Buyers (Bids)

No. Vol. Price($)
1 25561 4.5¢
 

Sellers (Offers)

Price($) Vol. No.
4.8¢ 55790 2
View Market Depth
Last trade - 16.10pm 04/07/2024 (20 minute delay) ?
BSX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.