IPC to Bowdens
Recommended Conditions B45 and B47 relating to the Tailings Dam5. The tailings dam is presumably constructed with NAF rock but this is not specified inthe draft Conditions. Section 5.6.2 of the Tailings Storage Facility Preliminary DesignReport (May 2020) prepared by ATC Williams refers to an understanding thatsufficient NAF rockfillis available from waste rock. Given the high ratio of PAF/NAFgenerally at the mine site, is there sufficient NAF rock fill to satisfy all the requirementsfor NAF rock fill? What contingency/condition would be required to ensure anadequate supply of NAF rock fill for all the mine's needs?6. The Tailings Storage Facility Preliminary Design Report refers to an estimate ofsteady state seepage at the end of LOM of less than 3L/sec. Three litres per secondequates to 93ML per annum. This is to be collected by the seepage collection systemdrained to the seepage collection ponds and subsequently pumped back to the TSFIs this an indefinite arrangement and who will be responsible for ongoing managementand oversight?
- Forums
- ASX - By Stock
- DPE to IPC Response
IPC to BowdensRecommended Conditions B45 and B47 relating to the...
Featured News
Add SVL (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.005(4.55%) |
Mkt cap ! $173.4M |
Open | High | Low | Value | Volume |
10.5¢ | 11.5¢ | 10.5¢ | $635.0K | 5.858M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 507491 | 11.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
11.5¢ | 772626 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 469671 | 0.110 |
45 | 2335820 | 0.105 |
59 | 3027582 | 0.100 |
5 | 158810 | 0.099 |
6 | 74046 | 0.098 |
Price($) | Vol. | No. |
---|---|---|
0.115 | 772626 | 7 |
0.120 | 651001 | 8 |
0.125 | 589317 | 17 |
0.130 | 2574834 | 8 |
0.135 | 1145088 | 22 |
Last trade - 16.10pm 01/11/2024 (20 minute delay) ? |
Featured News
SVL (ASX) Chart |