This has been drilling since 4 April and drilled to 1500 metres. So about 50 metres a day. Seems awfully slow. When is it expected to TD? I recall it being touted as 40 day well or have I got that wrong? JKA did well to get a cap on the carry if it continues at this pace.
- Forums
- ASX - By Stock
- dragon oil
This has been drilling since 4 April and drilled to 1500 metres....
-
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
AVH
Avita boosts skin restoration product portfolio with 'dermal matrix' – a kind of next-level gauze made of fake skin