I think they will mill out the remaining plugs in one trip. It shouldn't take long as they are designed to be easily milled out. The plan was to frac using 35,000Bbls of fluid (see Feb 2011 presentation, page 17). By next week's report, they should have recovered most of this and gas should be being produced with the recovered fluid in increasing volumes. As I said earlier, the quicker the recovery, the better the well. Looking at EKA, AUT's reports on the EF shale it normally takes a couple of weeks to clean up the well prior to the well being put on sales. Obviously 76H will not be put on sales as there is no pipeline yet, but flow testing should commence.
- Forums
- ASX - By Stock
- draining fluids
I think they will mill out the remaining plugs in one trip. It...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SYN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online