Thanks for that Redux and others.
What do you guys think about the fact that the trial Power Box at Stora Enso in Sweden has experienced problems since it was first installed back in Feb 2008 and is yet to be up and running in full capacity?
And that is with the Opcon engineers a few hours away, let alone on the other side of the planet.
I like this stock a lot, but my key issues are:
- Stora Enso issues
- capital structure and dilution that is occuring and will occur before this thing is up and running. Over 400 million shares already and they will need to raise several more times before they are cash flow positive. Lots of shares issued at 1c etc, means big big overhang.
- Forums
- ASX - By Stock
- VPR
- dramatic upside potential
dramatic upside potential, page-52
-
-
- There are more pages in this discussion • 50 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
Add VPR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $16.07M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
46 | 55096344 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 86358455 | 37 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
45 | 55046344 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 80608455 | 35 |
0.003 | 44374651 | 27 |
0.004 | 32401341 | 19 |
0.005 | 21323846 | 6 |
0.006 | 33329999 | 5 |
Last trade - 16.12pm 04/10/2024 (20 minute delay) ? |
Featured News
VPR (ASX) Chart |
Day chart unavailable