re: bhp interest in wim150 It was a tender process where interested companies had to show how and what they were going to do with it.
The Energy dept of Vic gave preference to smaller companies however Iluka was one of the many others that tried to secure it.
One condition is that a minimum amount of $$ must be spent every 1/4 and pa otherwise they will take it away.
That is why APG did a JV with Aust Zircon so that monies will be spent on the deposit on an ongoing basis.
Add to My Watchlist
What is My Watchlist?