maybe they have just secured the option for the drill rig, without yet committing drill time/date with the provider.
This might make sense for two reasons:
1. They may not have exact availability dates from the provider yet
2. if MEO still felt the Farm-In deal was going to go through, the Farm-In partner would more than likely be the one to contract with the drilling provider instead of MEO, and also the Farm-In would commit to drilling more than one hole, changing the size & nature of the drilling contract.
Just my Opinion.
- Forums
- ASX - By Stock
- drill date?
maybe they have just secured the option for the drill rig,...
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)