So maybe there was a 200 foot section that was free that was pulled today, with what is left needing to be washed over +/- milled (up to another 800 foot)?
- Forums
- ASX - By Stock
- drill pipe 200ft per day
So maybe there was a 200 foot section that was free that was...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)