Niel, what the hard part is that the wash over pipe is real thin, you cant run long lengths, it is real easy to get it stuck in the hole. If you have 50 feet of wash over pipe, you can only pull about 40 feet of drill pipe, as to a time frame I don't have a clue in hell. If you was on the rig you would have a better idea.
- Forums
- ASX - By Stock
- GDN
- drill pipe 200ft per day
drill pipe 200ft per day, page-9
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)