Disappointing that the drill results were in quarterly.
Where is the big announcement header
"significant discoveries along ashanti shear" - even though these were better than the last which had a great heading
OR
"Significant Mineralisation at Surface"
OR
"Surface Discoveries to be added to Mining Schedule"
Get this - they release the last drill campaign but we are still waiting 1800m from the last campaign - look below
BOABEDROO????? maybe this has got 40g/t or 20g/t???
LION to take???
"Samson" killed a Lion with his bare hands.
My Post previously
First - 21/2/11 - surface discovery
http://www.asx.com.au/asxpdf/20110221/pdf/41wx8wb0tnllt9.pdf
Second - 31/1/11 - quarterly report
http://www.asx.com.au/asxpdf/20110131/pdf/41whzj0rlf7ymd.pdf
Third - 9/12/10 - Drilling commences
http://www.asx.com.au/asxpdf/20101209/pdf/31vhbllrhjrfy9.pdf
Thanks Zia, but wanted to clarify, and I've said this before, but since time has passed seems to have been lost in the mist.
First link, released 21/2/11 - releases 1334m at Kyereben and 646m at Bimma South - total 1980m and states Kyekyewere and Boabedroo to be released "as soon as they are received".
Third link states drilling commences on 9/12/2010
Second link says - 7,729m drilled from recommencement, which MUST include Kyekyewere and Boabedroo.
Therefore:
Drilled - 7,729m
Released - 1,980m
Yet to release - 5,749m
This is from drilling commenced about 9/12/10 and completed by the quarterly report of 31/1/11, therefore the wait isn't only about 2 months but about 4-5 months and counting.
Kawkawkaw - maybe expect by Christmas and Santa will bring me a sack of gold.
Disappointing that the drill results were in quarterly.Where is...
Add to My Watchlist
What is My Watchlist?