I think us shareholders need to take into concideration the age and condition of the drilling rig we have drilling the well.delays and breakdowns are expected and time taken for repairs needs to be expected due to the location.we are using an old 500hp rig not a new 2000 hp rig.is like comparing an 81 falcon ute to a 2013 f350.the job will get done but will take a bit longer and a few more breakdowns and delays.
- Forums
- ASX - By Stock
- ETR
- drillimg rig
drillimg rig
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ETR (ASX) to my watchlist
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $13.88M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ETR (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online