NRZ 0.00% 1.3¢ neurizer ltd

Drilling, assembling, gas flow

  1. 4,783 Posts.
    lightbulb Created with Sketch. 149
    As I understand it they are now

    Assembling/ Constructing: 3 weeks into a 6-8 week program
    Drilling:    1 week into a 3-4 week drilling and encasing program

    I would like to hear or see updates letting us track progress towards first flow of gas. Not sure if first flow will rocket the share price as much as I expect it should- perhaps the fundies will want a full monthly or so or flow.... testing for quality and flow rate, make sure no explosions or whatnot, before she's really off to the races

    Do any tech bods here know if it needs a month or so to monitor/ test the gas flow information or if it is basic science and they'll know reasonably fast? Or is it a known quality (ie chemical reaction) and the question is mostly about flow rate?
 
watchlist Created with Sketch. Add NRZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.