Toastman, NEV23 was the last hole of the previous drill program. The current drill program of 10000 metres is starting with NEV24. NEV24 will be done with the first drill rig while they wait for the 2nd rig which can go down deeper to 1000m and is due for arrival later this month. The entry point for NEV24 is about 200m below NEV19 and will test the mineralisation 200 to 300m below NEV19 which was drilled to 524m (see figure 2 in today's announcement)
GOA Price at posting:
4.0¢ Sentiment: LT Buy Disclosure: Held