Another progress announcement made today by LKO.
TRIFON 2 DRILLING
TRIFON TIGHT GAS PROJECT
PEP 157, ONSHORE GIPPSLAND BASIN, VICTORIA
Lakes Oil (“LKO”) advises that at 6:00 AM today the Trifon 2 well was drilling ahead at 1254 metres.
Good progress continues with the drilling program.
Would be expecting some good results soon.
Buyer depth begining to increase with anticipation.
Worth watching at this point.
Cheers..
- Forums
- ASX - By Stock
- drilling continues - results expected soon
Another progress announcement made today by LKO.TRIFON 2...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares
AVH
Avita boosts skin restoration product portfolio with 'dermal matrix' – a kind of next-level gauze made of fake skin
KAI
Pilbara Minerals buys land off Kairos part of its York gold project for $20M – and a 2% royalty on any PLS gold sales
Add LKO (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.00 |
Change
0.000(0.00%) |
Mkt cap ! $58.8K |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LKO (ASX) Chart |
Day chart unavailable