STX 12.0% 28.0¢ strike energy limited

Drilling/Development Schedule, page-289

  1. 618
    3,160 Posts.
    lightbulb Created with Sketch. 2024
    Yes that's true regarding timing of rig slots and seismic. Given the success at Walyering as well as the reprocessed 2D seismic and well data from OH-1, I'd be surprised if OH is a failure.

    I suspect if the domgas policy is changed, we may also see a slight change in their priorities and drilling/seismic scheduling. ED1 and SWE1 will still proceed as planned, but SE phase 2 (additional 60TJ/d instead of 40TJ/d) may well jump ahead of WE in terms of FID so they can sell all of that gas to the export market since it won't be contracted.

    Note that even if we proceed with 100TJ/d development for WE, we would only have 25TJ/d for export since the other 25TJ is already contracted to CSBP.

    618
    Last edited by 618: 08/01/24
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
28.0¢
Change
0.030(12.0%)
Mkt cap ! $801.0M
Open High Low Value Volume
24.5¢ 28.3¢ 24.5¢ $7.221M 26.82M

Buyers (Bids)

No. Vol. Price($)
5 293004 27.5¢
 

Sellers (Offers)

Price($) Vol. No.
28.0¢ 820079 16
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.