TMX 0.00% 0.4¢ terrain minerals limited

Sorry @GT55 I just don't believe the lab(s) haven't given some...

  1. 1,367 Posts.
    lightbulb Created with Sketch. 220
    Sorry @GT55 I just don't believe the lab(s) haven't given some type of time frame as to when they will either start the analysis or have the results completed. I don't know any business or industry that operates under that kind of policy (i.e. advising the customer they have no idea when their services will be completed). The labs would know how long it will take based on the number samples submitted including the number of clients ahead of TMX's order.

    Putting that aside what's going on with Wild Viper then? The geologist was on site over a month ago. The last announcement appears to have been in November (05/11/2020 Commencement of 2,650m drill program at Wild-viper) and nothing since then.

    https://hotcopper.com.au/data/attachments/3299/3299203-f3ca304f63b5b18e779dc97546f53658.jpg

    Copy and Paste - WA gold exploration Project JV (80% TMX)
    Remove and replace- Terrain has the options to earn 80% of the project area via exploration expenditure.

    Wow, that was real time consuming.
 
watchlist Created with Sketch. Add TMX (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $7.200M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $23.57K 5.893M

Buyers (Bids)

No. Vol. Price($)
14 14708412 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 1756875 1
View Market Depth
Last trade - 12.35pm 11/11/2024 (20 minute delay) ?
TMX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.