Hi Boeing and happy new year to all
I too am confused as Rig 3 can do the job IF the board intend on drilling to the same depth at RG. I recall when RG was first drilled there was a tight time frame due to there only being a couple of rigs that could get the depth required. From memory DCA were the contractors back then.