CND 0.00% 3.1¢ condor energy limited

drilling program update for georgina basin

  1. 29 Posts.
    Delays in drilling occurred when the bit tracked into the underlying Thorntonian Limestone
    Formation after encountering an unexpected fault. Every effort was made to redirect the bit
    upwards back into the Lower Arthur Creek "Hot Shale", but the bends in the hole became
    too severe for an effective future well completion. The new horizontal section kicked off
    along the regional dip established by the plugged back portion of the well and was
    successfully steered through the Lower Arthur Creek "Hot Shale". Total gas recorded in
    Baldwin-2Hst1 averaged 240 units over the entire horizontal section, commonly peaking
    above 1,000 units with maximum recorded values over 2,500 units. The gas recorded
    contained heavier hydrocarbon fractions up to pentane ("C5") over much of the horizontal
    section. Conventional gas ratio analysis indicates very wet gas to oil for the most of the well
    with occasional definite oil signatures in places. However, this interpretation may be biased
    to gas due to the nature of the reservoir being intersected.
 
watchlist Created with Sketch. Add CND (ASX) to my watchlist
(20min delay)
Last
3.1¢
Change
0.000(0.00%)
Mkt cap ! $17.91M
Open High Low Value Volume
3.2¢ 3.2¢ 3.1¢ $9.806K 312.2K

Buyers (Bids)

No. Vol. Price($)
5 623450 3.1¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 23333 1
View Market Depth
Last trade - 15.56pm 28/06/2024 (20 minute delay) ?
CND (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.