GD
The BOP's are at the bottom of the riser (the big pipe that the drilling fluid and cuttings travel up from the sea floor to the rig) and is connected to the wellhead on the seafloor.
These days you can get BOP's that actually sit on the rig at surface, but in this case, they will be using the old fashioned sea-floor unit.
Picko
- Forums
- ASX - By Stock
- KAR
- drilling progress report
drilling progress report, page-8
-
- There are more pages in this discussion • 56 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.46 |
Change
-0.065(4.26%) |
Mkt cap ! $1.160B |
Open | High | Low | Value | Volume |
$1.51 | $1.52 | $1.45 | $15.96M | 10.84M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 45 | $1.46 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.47 | 119063 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 7000 | 1.455 |
24 | 143536 | 1.450 |
2 | 5365 | 1.445 |
7 | 87553 | 1.440 |
2 | 12589 | 1.435 |
Price($) | Vol. | No. |
---|---|---|
1.470 | 5729 | 1 |
1.475 | 5729 | 1 |
1.480 | 5729 | 1 |
1.485 | 5729 | 1 |
1.490 | 5729 | 1 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
KAR (ASX) Chart |