NSE new standard energy limited

drilling report 25th oct, page-7

  1. 6,650 Posts.
    lightbulb Created with Sketch. 1
    I just read the buru details about Paradise 1 deepening.

    I far as i can see from that report the well has been P&A and so that means that Buru is not planning to return or re-enter.

    Now have a look at the announcement on the 21st May where it says that Paradise 1 was suspended due the onset of the wet season.

    Top section below copied below

    Commencement of Paradise-1 deepening operation

    Buru Energy Limited advises that drilling operations for the deepening of the Paradise-1 well commenced at 21:00hrs, 20 May 2012 (AWST) using Century Rig #7.

    As at 06:00hrs on 21 May 2012 (AWST) the current operation was preparing to conduct a cement squeeze and Formation Integrity Test (“FIT”) at the casing shoe prior to drilling ahead.

    The Paradise-1 deepening operation is the second well in the Buru – Mitsubishi Corporation (“MC”) 2012 Joint Exploration Program.

    The Paradise-1 well is located in exploration permit EP 428 on the boundary with EP 371, some 200 kms southeast of Derby. Buru and MC each have a 50% interest in this well and in EP 428, with MC contributing 80% of the cost of the well under the terms of its farm-in agreement with Buru.

    The existing Paradise-1 well was drilled by the Buru and MC joint venture in late 2010 to a depth of 1,700 metres. The well was completed with 7” casing to that depth and then suspended due to operational issues and the onset of the wet season.

    The Paradise-1 well encountered an interpreted 9 metre oil zone in sands


 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.