STX 1.19% 21.3¢ strike energy limited

drilling report due out today, page-7

  1. 56,530 Posts.
    lightbulb Created with Sketch. 258
    The drilling muds cause this debris to rise to the top of the well for removal. In a lost circulation zone, this recovery of debris does not work for any number of reasons, such as cross flow or voids within the borehole.

    Lost circulation can result in numerous other drilling problems including stuck drill pipe, damaged bits, slow penetration rates, and collapsed boreholes. Traditionally, lost circulation zones are filled with cement plugs. By filling the borehole with cement and then drilling through the cement, any cross flows or voids are blocked off which allows drillers the ability to remove drilling debris from the borehole.
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
21.3¢
Change
0.003(1.19%)
Mkt cap ! $600.7M
Open High Low Value Volume
21.0¢ 21.3¢ 21.0¢ $463.9K 2.202M

Buyers (Bids)

No. Vol. Price($)
40 936074 21.0¢
 

Sellers (Offers)

Price($) Vol. No.
21.5¢ 2769608 58
View Market Depth
Last trade - 11.14am 18/07/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.