VPE 0.00% 41.5¢ victoria petroleum nl

drilling report..., page-2

  1. 164 Posts.
    re: drilling report...a drill stem test will be co " A Drill Stem Test will be conducted on penetration of the Precipice Sandstone, irrespective of the quality of shows." See ann. below.

    Interesting statement to be made... Do they have a sniff of HC??? The big $$$ question. Let's watch the buying before close....

    19 February 2004
    Centralised Company Announcements Office
    Australian Stock Exchange Limited
    10th Floor, 20 Bond Street
    SYDNEY NSW 2000
    Dear Sir,

    RE: OILEX NL- PROGRESS- GILIGULGUL NORTH-1 WELL

    Giligulgul North-1 was at 1,288 metres at 6.00 am.

    Current operation is drilling ahead in the Evergreen
    Formation. Formation tops have come in at about 2 metres low to prognosis.

    The primary target is the Precipice Sandstone at 1,300 metres. A Drill Stem Test will be conducted on penetration of the Precipice Sandstone, irrespective of the quality of shows.
    Participating
    Interests:
    Oilex NL (Operator) 34.5%
    Victoria Petroleum NL 30% (Carried interest for this well)
    Arrow Energy NL 12.5%
    Private Interests 23%
    Yours faithfully,
    David Archibald
    Managing Director
    cc: MDC/GIJ
 
watchlist Created with Sketch. Add VPE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.