The overall results are indicative of a higher grade deposit in Dakota’s Lynas Find Project compared to the regional average in the Pilgangoora Lithium District. High grade mineralisation is still open along strike and down dip, and will be targeted in the next round of drilling WAS THE BEST BIT
- Forums
- ASX - By Stock
- DKO
- Drilling results due Friday 17 for Phase 2 at the eariest.
Drilling results due Friday 17 for Phase 2 at the eariest., page-104
-
- There are more pages in this discussion • 43 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity