I noticed that to Alvin. It doesnt look like the most powerful rig geting around.
In mangements defence though it is a 'man' transportable rig as there are no roads or tracks into the area at this stage. Once they have completed this recon drilling I believe they will build some tracks into the areas of importance so they can get a more serious rig on the job.
Very early days. The location of pad 4 illustrates they are finding out more about the Guchab area all the time. Imo they would have gone to pad 4 location after pad 1 if they knew it existed. Pad 4, due to old workings gives them a much better idea about the orientation of the fault than what they would have at pad 2, allowing for more targeted drilling.
- Forums
- ASX - By Stock
- SBR
- drilling results from pad 2
drilling results from pad 2, page-54
Featured News
Add SBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.501M |
Open | High | Low | Value | Volume |
1.4¢ | 1.4¢ | 1.4¢ | $432 | 30.89K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 454023 | 1.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.4¢ | 119108 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 454023 | 0.013 |
3 | 276923 | 0.012 |
3 | 418726 | 0.011 |
3 | 422818 | 0.010 |
2 | 495000 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 119108 | 1 |
0.015 | 404929 | 2 |
0.018 | 218550 | 2 |
0.020 | 78442 | 3 |
0.021 | 57008 | 1 |
Last trade - 10.27am 05/09/2024 (20 minute delay) ? |
Featured News
SBR (ASX) Chart |