Well, they probably could get someone with a fairly good record in project development experience and metallurgy to join the board fairly easily. Once they've got the JORC out.
My estimate, back of the envelope, is 120Mt-140Mt @ 500ppm Mo. This would be an upgrade from the September 2010 figure due to the better grades seen in the latest drilling. It is pretty clear however, that they need to substantially deepen a lot of their RC holes with diamond tails.
ZGM Price at posting:
14.0¢ Sentiment: LT Buy Disclosure: Held