Good evening clowns.
The Nickel results from today's presentation are ALL OLD.
If you look at the Presentation from 30/11/2011 you will see the following results noted in it, which were mentioned today:
- Rock float: 49% Ni.
- Drilling: 5m @ 1.4% Ni, incl. 2m @ 2.2% Ni.
You can also find the following trenching results, mentioned in today's presentation, in the DEC 2011 Quarterly Activites report dated 31/01/2012:
- Trenching: 7.8m @ 3.2% Ni.
There are also trenching results in the same Quarterly report from the Iyewe prospect:
- Trenching: 1.7m @ 12.33% Ni.
So we are still waiting on the "follow-up trenching results" as mentioned in the last Nickel announcement.
Good night, and hope they bring out the latest trenching results this year (xmas is just around the corner)!
- Forums
- ASX - By Stock
- drilling results
Good evening clowns.The Nickel results from today's presentation...
-
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)