RNS Number : 3192L
Goldstone Resources Ltd
09 August 2013
?
GOLDSTONE RESOURCES LIMITED
("GoldStone" or the "Company")
SANGOLA DRILL RESULTS
GoldStone (AIM; GRL), the AIM quoted exploration company focused on gold exploration in West and Central Africa, is pleased to provide drill results for its Sangola project in Senegal, where it has a joint venture with Randgold Resources (Senegal) Limited ("Randgold").
Highlights:
· Drilling results confirm gold mineralisation in a 70 metre wide zone
· Best gold intersects include:
o 39 metres @ 0.67 g/t (including 2 metres @ 5.4 g/t);
o 27 metres @ 0.45 g/t; and
o 2 metres @ 5.1 g/t (including 1 metre @ 9.9 g/t)
Jurie Wessels, Chief Executive Officer of the Company, commented: "We are very pleased with our exploration partner's rapid progress at Sangola. We are looking forward to the completion of Randgold's annual drilling commitment, which is planned to start at the onset of the dry season in December."
The Company has received assay results of the first 2,435m from the 4,800m reverse circulation ("RC") drilling programme which has been completed by Randgold in the Sangola permit area. The results received are for 28 holes drilled along six drill fences across the Thiabedji target and one drill fence across the Tiobo target. Drill hole depths range from 80 metres to 135 metres. Best gold intercepts are given in the table below.
Drill Hole
Target
From (m)
Width (m)
Gold (g/t)
TDRC006
Thiabedji
42
38
0.34
TDRC007
Thiabedji
36
27
0.45
TDRC009
Thiabedji
72
39
0.67
including
7
2.2
including
2
5.4
TDRC010
Thiabedji
24
8
0.44
TDRC011
Thiabedji
24
11
0.45
including
2
2.6
TDRC011
Thiabedji
92
2
5.1
including
1
9.9
TBRC002
Tiobo
56
5
0.61
including
1
1.9
Plotted on section, the Thiabedji results confirmed a zone of gold mineralisation up to 70 metres wide in a boudinaged unit of silicified quartzites within a volcanoclastic package. This mineralisation appears to be the depth extension of the best results achieved during last year's Rotary Air Blast drilling programme. The analyses were carried out by SGS Kayes in Mali using the fire assay method. The lower limit of detection was reported to be 0.01 g/t gold. Further results for approximately 2,400 metres of RC drilling over the Tiobo target area are still pending. Drilling over the Tiobo, Baraboye and Ibel target areas will re-commence after the rainy season, which is expected to be during December 2013.
APPROVAL
The information in this report that relates to exploration results, is based on information compiled by Dr Schloemann who is a Member of the South African Council for Natural Scientific Professions. Dr Schloemann is a full-time employee of GoldStone Resources Limited. Dr Schloemann has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking, to qualify as a competent person in terms of the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Dr Schloemann consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
Add to My Watchlist
What is My Watchlist?