Seems to be some concern over the lack or reported results to date? Emailed Kevin a few times and his reply has been consistant, he will report results when he has them and they are checked. Below are my thoughts,
6/2/14 Fieldwork Commenced Liberia(8.5 wks):
8.5 weeks seems to be over the normal duration for auger drilling results, but factor in that this work is being managed by a third party and the results were sent to Mali for processing and I think we have the reason for the extended timeframe e.g.
Expected Drilling / Results window 4-6 weeks
Transported to Mali for processing add 1-2 weeks
Third party analysis and reporting add 1-2 weeks
Kevin review of information and clarification add 1-2 weeks
21/2/14 Auger Drilling Commenced Missigui(6 wks):
Based on past timing these auger results should be close?
12/3/14 AC Drilling Commenced Missigui(4 wks):
Possibly close but more likely another week or 2 for these results.
Yes the wait is killing me too.
- Forums
- ASX - By Stock
- FFX
- drilling results
drilling results
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FFX (ASX) to my watchlist
|
|||||
Last
20.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $236.5M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
FFX (ASX) Chart |
Day chart unavailable
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online