3000mtr drilling program started at Peak Hill,starting with the Jubilee prospect. After they've finished here they are going to move rig to the Mt Padbury project.
Things are finally starting to happen. Look forward to results.
- Forums
- ASX - By Stock
- drilling started at peak hill
3000mtr drilling program started at Peak Hill,starting with the...
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add E25 (ASX) to my watchlist
|
|||||
Last
20.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $45.08M |
Open | High | Low | Value | Volume |
21.0¢ | 21.0¢ | 20.5¢ | $3.293K | 15.99K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1481 | 21.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
22.0¢ | 160892 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1481 | 0.210 |
3 | 3984 | 0.205 |
10 | 431896 | 0.200 |
1 | 50000 | 0.195 |
4 | 22828 | 0.190 |
Price($) | Vol. | No. |
---|---|---|
0.220 | 160892 | 4 |
0.225 | 30816 | 2 |
0.230 | 28999 | 1 |
0.235 | 3126 | 2 |
0.240 | 28898 | 3 |
Last trade - 10.32am 05/07/2024 (20 minute delay) ? |
Featured News
E25 (ASX) Chart |