so the well was spudded on the 6th may
by the 20th of may it was 2046m brt or 181m a day average drilling
by the 27th may it was 3195m brt or a average over the week of 164m
with a little over 800 more metres to drill it would seem that we should get to the 4010m some time within the next few days if not there already.
Could be an interesting start to the trading week. Was a bit worried about the fall at the end of the week due to oil going up hopefully no bad news is the cause of this.Looking at the pictures in the presentation is seems that by now they should have drilled through both target zones being the Dua and Cau sandstone target areas can anyone with experience in this field comment ?
Add to My Watchlist
What is My Watchlist?