CND 3.23% 3.0¢ condor energy limited

Lest. My apologies for not touching base sooner...Ensign Rig 918...

  1. 1,834 Posts.
    lightbulb Created with Sketch. 1
    Lest.
    My apologies for not touching base sooner...
    Ensign Rig 918 is due to spud Marsden-1 well for Strike/Beach, tomorrow (22/2/12)..

    Well is expected to take around 30 days (???) to complete;plus rig down and de-mob....That would take us to around about the 23rd.of March..

    Realistically,one could add at least another 30 days for any necessary maintenance, plus mobilization to Mac-2H..and rig up once on site in EP127..

    In considering the above, I would alter my previously posted timetable,to commence a month later,IE.918 to mobilize to Macintyre-2H approx.EARLY May!!
 
watchlist Created with Sketch. Add CND (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.