Exploration Office 11A Croydon Rd Keswick SA 5035 Tel +61 8 8375 3900 Fax +61 8 8375 3999 ABN 96 110 336 733 www.monaxmining.com.au ASX RELEASE For Immediate Release 28 August 2006 DRILLING TO COMMENCE AT PUNT HILL Monax Mining Limited (ASX Code ‘MOX’) advises that the delay with the drill rig has been resolved and it is now expected to arrive on site on Monday the 4th of September 2006. Monax and the exploration team are currently on site and continuing preparations for the arrival of the drill rig. The team is ready for drilling to commence as soon as the drill rig arrives. For further information please contact: Michael Schwarz, Managing Director, Monax Mining Ph: (08) 8375 3900, mob: 0402 101 790 Email: [email protected]
MOX Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held