Does anyone find it a bit strange that we get a drilling update two days later after recieving first drilling results,only to be told that drilling of M38 has been plagued by continual breakdowns (which I don't believe to be the case). M38 from as far as I am aware has been completed. And was completed over 2 weeks ago. Hence my sceptisism with regards to RCH's adhereing to the rules of continuous disclosure.
Thank god they have fantastic grades.
RCH
richfield group limited
drilling update after driling results
Add to My Watchlist
What is My Watchlist?