Drilling Update at Maroochydore Copper JV · First 7 RC drill holes completed, with remaining 6 holes to be drilled once larger capacity rig becomes available. · Good copper intercepts from all 7 holes, including 7m @ 2.45% Cu. · Assay results in line with expectations for this infill drilling of the existing JORC resource of 51Mt @ 1% Cu and 0.04% Co. · 6 hole diamond drilling program planned to provide further infill drilling of the JORC resource and obtain metallurgical test samples. Murchison United NL (ASX: MUR, AIM: MUU) is pleased to announce results of recent drilling at the Maroochydore Copper Joint Venture Project in Western Australia undertaken by the project operator, Aditya Birla Minerals Limited (ASX: ABY). The assay results are from the first 7 vertical drill holes of a planned program comprising 13 RC drill holes for a total of 1,500 metres. This program is designed in part to provide infill drilling of the existing JORC compliant resource at the Maroochydore Project of 51 million tonnes @ 1% Cu for 0.51 million tonnes of contained copper and 20,000 tonnes contained cobalt (at 0.5% Cu cut-off). All RC holes are being drilled within the existing resource boundary. The results received positively demonstrate continuity of mineralisation within the small area drilled, with copper grades in line with expectations.
Good news?
MUR Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.